Installation

From Versacall Support
Revision as of 21:46, 17 May 2018 by SupportAdmin (talk | contribs) (Created page with "=Overview= All the links on this page go to guides focused on the installation of hardware. There are different levels we suggest starting at Level 1 and working your way down...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Overview

All the links on this page go to guides focused on the installation of hardware. There are different levels we suggest starting at Level 1 and working your way down. This will ensure that you have the correct hardware installed so that the new hardware will work correctly once it is installed.


Level 1

The first level is the installation of a control unit. These are available as a Mini, Standard or Rack Mounted Server.

1. Instructions on installing a Mini Control Unit - Click Here.

2. Instructions on installing a Standard Control Unit -

3. Instructions on installation a Rack Mounted Server -


Level 2

The second level focuses on the installation of additional hardware that connects to the Control Unit. This would include Coordinators, Paging Transmitters, Radio Transmitter and Phone Modem.


Coordinator

1. Instructions on installing a USB Coordinator -

2. Instructions on installing a Remote Coordinator on a Different Subnet -

3. Instructions on installing a Remote Coordinator on the Same Subnet -


Paging Transmitter

1. Instructions on installing a USB Paging Transmitter -

2. Instructions on installing a Remote Paging Transmitter on a Different Subnet -

3. Instructions on installing a Remote Paging Transmitter on the Same Subnet -