VT3000 - Install PSM with IO
Revision as of 20:11, 7 November 2018 by SupportAdmin (talk | contribs)
Overview
If you have purchased a new PSM for your existing system please follow the steps below. If this is a new system, please ensure that you have the control unit installed with the coordinator operating normally.
Unpack
You will have the following components after unpacking:
Instructions
Select EXPAND to view an Animated Graphic for the step.
Step 1: Mount IO Module within 6 feet of an electrical outlet. |
Step 2: Attach Touch Screen to the mount using the included screws. |
Step 3: Mount the Touch Screen within 6 feet of an electrical outlet & within 20 feet of the IO Module. |
Step 4: Find & Note of the Mesh Address on IO Module. - plug in IO Module & the Touch Screen. |
Step 5: Plug in the IO Module & Touch Screen power. |
Step 6: The IO Module & Touch Screen will automatically connect - verify Bluetooth connection on the Touch Screen. |
Step 7: Open VT3000 Core Software select Diagnostics - select Device Status. |
Step 8: Find the IO Mesh Address in the Address field - select Options link on the right. |
Step 9: Select Configuration. |
Step 10: Select a Device Configuration from the New Configuration field - select Update Configuration button. |
Step 11: Go to the Touch Screen - verify the correct module name shows in the top left corner. |
Step by Step Guides
Click Here for a guide on updating the configuration of a BSC, TIM or PSM.