VT3000 - Add Shifts/Schedule
- The Shifts/Schedules section is used to set up a schedule of shifts being used in your plant.
- This schedule is shared with all VersaCall applications.
- Reports & Virtual Panels will use the Schedule to filter data.
- The VT3000 Core Software installed and running on your system.
- Permission to Add, Edit or Delete Schedules.
Step 1
Open the VT3000 web interface – select VT3000 Core Software - log in – select Configuration – select Shifts/Schedules.
Step 3
By default the schedule is set to Standard schedule type – the following options are available.
- Schedule Name – enter a name for the schedule.
- Start of Day – enter your start of day time.
- Crossover – leave this set to Auto Detect.
- Schedule Type – leave this set to Standard.
Step 4
When a Rotating schedule type is selected - the following options are available.
- Schedule Name – enter a name for the schedule.
- Start of Day – enter your start of day time.
- Schedule Type – select Rotating.
- Reference Date – select the day your week/rotating schedule begins.
- # of Days in Rotation – enter to total number of days to be included in this schedule.
Step 6
Select the Add button for a new shift or select an existing shift and select the Edit button.
Step 7
Shift Setup
A Standard schedule - Shift will have the following options:
- Shift Name – enter the name for the shift.
- Use by Default – leave this checked.
- Start Time – enter the time the shift begins.
- End Time – enter the time the shift ends.
- Applies To – select the days this shift will be used.
- Breaks – select Add Break to setup a break/lunch.
Step 7
Break Setup
A Standard schedule - Break will have the following options:
- Start Time – enter the time the break begins.
- End Time – enter the time the break ends.
- Description – enter a name for the break.
- Delete – select Delete to remove a break after it has been added.
Step 8
A Rotating Schedule - Shift will have the following options:
- Shift Name – enter a name for the shift.
- Shift ID – this is created by the VT3000 software.
- Use by Default – leave this checked.
- Days – based on the Reference Date, select a day to setup.
Step 9
Shift Setup
A Rotating Schedule - Shift will have the following options:
- Enabled – select to enable this shift for this day.
- Start Time – enter the time the shift will begin.
- End Time – enter the time the shift will end.
- Breaks – select Add Break to setup a break/lunch.
Step 9
Break Setup
A Rotating Schedule - Break will have the following options:
- Start Time – enter the time the break begins.
- End Time – enter the time the break ends.
- Description – enter a name for the break.
- Delete – select Delete to remove a break after it has been added.
Select a Guide Here |
Augment a Schedule (Day(s) or Shift(s) |
Create a Schedule Print Out |
Type Subject or Key Word to Query Archives |
---|