Difference between revisions of "Installation"

From Versacall Support
Jump to navigation Jump to search
Line 84: Line 84:
=='''Module Installation'''==
=='''Module Installation'''==


COMING SOON
==='''Call Station'''===
There are 2 types of Call Stations, Battery and Powered.
 
<gallery widths=300>
File:InstallCS1.png|Battery
File:InstallCS2.png|Powered
</gallery>
 
 
'''1.''' [[VT3000_-_Install_Call_Station_-_Battery|'''Click Here''']] to view the step by step guide on installing a '''Battery Powered Call Station'''.
 
'''2.''' [[VT3000_-_Install_Call_Station_-_Powered|'''Click Here''']] to view the step by step guide on installing a '''Powered Call Station'''.
 
 
==='''BSC Module'''===
There are 2 types of BSC, Touch Screen with an IO Module and Touch Screeen without an IO Module..
 
<gallery widths=300>
File:InstallBSC1.png|IO Module
File:bscin18.png.png|Touch Screen
</gallery>
 
 
'''1.''' [[VT3000_-_Install_BSC_without_IO|'''Click Here''']] to view the step by step guide on installing a '''BSC without an IO Module'''.
 
'''2.''' [[VT3000_-_Install_BSC_with_IO|'''Click Here''']] to view the step by step guide on installing a '''BSC with an IO Module'''.

Revision as of 16:01, 25 May 2018

Hardware Installation

This page will provide direction and links to hardware components that you need to install. Please start with section one and move down according to your set up.


Core Unit Installation

Step 1

If you have just received a new VersaCall system, you will want to start with installing the VersaCall Computer or Control Unit.

There are 3 types of Control Units:


1. Click Here to view the step by step guide on installing a Mini Control Unit.

2. Click Here to view the step by step guide on installing a Standard Control Unit.

3. Click Here to view the step by step guide on installing a Rack Mount Control Unit.


Step 2

If you control unit is up and running, the next item to install is the Mesh Coordinator.

There are 2 types of Coordinator:


1. Click Here to view the step by step guide on installing a USB Coordinator.

2. Click Here to view the step by step guide on installing a Remote Coordinator on the Same Subnet.

3. Click Here to view the step by step guide on installing a Remote Coordinator on a Different Subnet.


Step 3

If you purchased a paging transmitter, please use one of the guides below. If you did not purchase a paging transmitter, proceed to Step 4.

There are 2 types of Paging Transmitters:


1. Click Here to view the step by step guide on installing a USB Paging Transmitter.

2. Click Here to view the step by step guide on installing a Remote Paging Transmitter on the Same Subnet.

3. Click Here to view the step by step guide on installing a Remote Paging Transmitter on a Different Subnet.


Step 4

If you purchased a phone modem, please use the guide below. If you did not purchase a phone modem, proceed to Step 5.


1. Click Here to view the step by step guide on installing a Phone Modem.


Step 5

If you purchased a 2-way radio, please use the guide below. If you did not 2-way radio, proceed to Module Installation.


1. Click Here to view the step by step guide on installing a 2-Way Radio.


Module Installation

Call Station

There are 2 types of Call Stations, Battery and Powered.


1. Click Here to view the step by step guide on installing a Battery Powered Call Station.

2. Click Here to view the step by step guide on installing a Powered Call Station.


BSC Module

There are 2 types of BSC, Touch Screen with an IO Module and Touch Screeen without an IO Module..


1. Click Here to view the step by step guide on installing a BSC without an IO Module.

2. Click Here to view the step by step guide on installing a BSC with an IO Module.